person shoveling snow, up to chest in snow

Orono Snow and Ice Page

Snow and Ice Procedures

The city’s snow plow plan varies depending upon the amount of snow that falls. If less than 2 inches falls, only major streets in the city system are plowed. Ice control is performed at stop signs, hills, bridges and curves and the entire system. If more than 2 inches of snow falls, all city streets are plowed curb-to-curb. Plowing all streets, including the removal of snow from cul-de-sacs, requires 8 to 10 hours.


For more information about our snow plowing and ice control policy visit:

Orono Snow and Ice Procedures


Orono Plow Routes

Share on Facebook
Share on Twitter
Share via Email

Copyright 2017 Orono, MN. All Rights Reserved.
2750 Kelley Parkway, Orono, MN, 55356

Powered by
CivicSend - A product of CivicPlus